Updates

Your gateway to all content to date. Search and/or drill down with filters to narrow down the content.

66 entries found
Sort by: Latest |Relevance
31 Oct 2006 description

Introduction

This is the eleventh report prepared by the WaSH Monitoring Program during this phase. The previously distributed reports included information about 497 communities in total. The current report includes information about 38 communities that were surveyed during the past two weeks (October 2006).

In this report, collected data and information, as was done in the previous reports, are presented in different tables where each table reflects at least one of the major problems affecting the WaSH situation in these communities.

30 Sep 2006 description

Introduction

This is the tenth report prepared by the WaSH Monitoring Program during this phase. The previously distributed reports included information about 420 communities in total. The current report includes information about 77 communities that were surveyed during the past two weeks (September 2006).

In this report, collected data and information, as was done in the previous reports, are presented in different tables where each table reflects at least one of the major problems affecting the WaSH situation in these communities.

31 Aug 2006 description

Introduction

This is the ninth report prepared by the WaSH Monitoring Program during this phase. The previously distributed reports included information about 322 communities in total. The current report includes information about 98 communities that were surveyed during the past several weeks ( July and August 2006).

31 Jul 2006 description

Introduction

This is the eighth report prepared by the WaSH Monitoring Program during this phase. The previously distributed reports included information about 261 communities in total. The current report includes information about 61 communities that were surveyed during the last two weeks of July.

In this report, collected data and information, as was done in the previous reports, are presented in different tables where each table reflects at least one of the major problems affecting the WaSH situation in these communities.

30 Jun 2006 description

Introduction

This is the seventh report prepared by the WaSH Monitoring Program during this phase. The previously distributed reports included information about 191 communities in total. The current report includes information about 70 communities that were surveyed during the last two weeks of June.

In this report, collected data and information, as was done in the previous reports, are presented in different tables where each table reflects at least one of the major problems affecting the WaSH situation in these communities.

30 Jun 2006 description

Introduction

This is the sixth report prepared by the WaSH Monitoring Program during this phase. The previously distributed reports included information about 145 communities in total. The current report includes information about 46 communities that were surveyed during the past three weeks.

In this report, collected data and information, as was done in the previous reports, are presented in different tables where each table reflects at least one of the major problems affecting the WaSH situation in these communities.

31 May 2006 description

Introduction

This is the fourth report prepared by the WaSH Monitoring Program during this phase. The first three reports distributed previously included information about 92 communities in total. The current report includes information about 53 communities that were surveyed during the past three weeks.

In this report, collected data and information, as was done in the previous reports, are presented in different tables where each table reflects at least one of the major problems affecting the WaSH situation in these communities.

30 Mar 2005 description

Introduction

The first section of this report presents a summary of urgent problems and needs in some of the Palestinian communities in the West Bank and Gaza Strip.

The second section includes summary of results of the information and update for communities surveyed during March 2005. The section includes four major tables with brief comments on the data presented in these tables.

Section one: Urgent problems and needs in Palestinian communities

1.

28 Feb 2005 description

16 - 28 February / 2005

Introduction

This report includes summary of results of the information and update for communities surveyed during the period 16-2-2005 to 28-2-2005. The section includes four major tables with brief comments on the data presented in these tables.

Summary of information and update for the surveyed communities during 16 - 28 February 2005.

  • The WaSH MP has been updating the data collected during the past two years.
15 Feb 2005 description

16 January - 15 February/2005

Introduction

The first section of this report presents a summary of urgent needs in some of the Palestinian communities in the West Bank. A Newsflash concerning some communities was distributed on Wednesday, February 16th, 2005.

The second section includes summary of results of the information and update for communities surveyed during the previous four weeks. The section includes five major tables with brief comments on the data presented in these tables.

Section one: Urgent needs in Palestinian communities

1.