Informing humanitarians worldwide 24/7 — a service provided by UN OCHA

Philippines

Mount Pinatubo Recovery Action Plan Long Term Report: Eight River Basins Republic of the Philippines | Main Report Vol. 1

Attachments

The U.S. Agency for International Development (USAID) contracted with the U.S. Army Corps of Engineers (USACE) for the preparation of a comprehensive Recovery Action Plan (RAP). The RAP evaluates methods for controlling the sedimentation within eight river basins and the higher risk of flooding due to sediment-clogged drainage channels resulting from the June 1991 volcanic eruption of Mount Pinatubo.