Informing humanitarians worldwide 24/7 — a service provided by UN OCHA

oPt

Gaza Strip - Preliminary Debris Quantification - July 2024

Attachments

This initial quantification of conflict generated debris in the Gaza Strip is derived from a UNOSAT Comprehensive Damage Assessment using imagery from 6 July 2024, in conjunction with updated building footprint as of May 2023 based on the national statistical office data.
Damaged building footprints were enriched through zonal statistics with an above surface height model, derived from the difference between a Digital Terrain Model (SRTM) and a Digital Surface Model (ALOS World 3D) as provided by the European Commission in the GHS-Built H product.
For modelling purposes, minimum building height and average story height were considered to be 3m. Each built sq. meter is considered to have generated 1 tonne of debris.
For visualization and modelling purposes, results were aggregated into an H3 hexagonal grid where each cell is 250m wide.