GLIDE n=B0 FL-2009-000052-COL
Period covered by this Final Interim
Report: 11 March to 30 October 2009
Appeal target: CHF 486,453 (USD 475,293
or EUR 322,033).
Final Appeal coverage: 100%;
Appeal history:
- This Emergency Appeal was initially
launched on a preliminary basis on 11 March 2009 for CHF 1,110,665 (USD
957,924 or EUR 757,518) for 6 months to assist 25,000 beneficiaries.
- Operations update n=B0 2 reflected a
revised budget, as the funding for the initial Appeal target stood at approximately
41 per cent. The budget was therefore revised down to CHF 465,304 (USD